MTE Selous 2024, Zimbabwe

Loading Events
Material handling equipment supplier
Global omnichannel solutions provider
For the past 20 years, we have served in the pump industry with a vast product variety that caters for the Mining, Industrial, Agricultural and Utility markets.
At AxFlow/AQS we value the strong partnerships we have with our suppliers and clients alike and strive to consistently unlock value for every customer, every time, by providing trusted pumping solutions within a culture of adaptability and passion.
Providing quality innovative lighting technology and lighting solutions, locally and internatonally
PFERD is leading in the development, production and support, as well as in the distribution, of tool solutions for work on surfaces and material cutting.
Invincible Valves (Pty) Ltd was established in 1982 and since has grown to a medium sized enterprise located in Knights, Germiston. Invincible Valves prides itself on service excellent and flexibility by striving to enhance our customer’s bottom line.
Specialise in a wide range of heat-transfer products and services

Some of the expertise you can see on the day;

  • Abrasive manufacturer
  • Anchoring and fastening technology
  • Bearings, valves, vee belts, valve repairs, asset management, technical services and pumps
  • Caterpillar equipment
  • Conveyor belting and rubber manufacturing
  • Distribution of electrical, electronic, mechanical and industrial products
  • Distributor of Relmo electric motors, air flow fans, electrical lighting systems and duCELLIER batteries
  • Electrical engineering supplies and professional services
  • Engineering design and fabrication, wear solutions and industrial 3D Printing
  • Fire and dust control
  • Fuel handling equipment, oil dispensing equipment and garage equipment
  • Importers and distributors of pumps in southern Africa
  • Industrial light fittings
  • Industrial lighting and LED experts
  • Industrial valve specialists
  • Instrumentation and condition monitoring
  • Laboratory equipment supplier
  • Low voltage switch gear
  • Manufacture of electrical cables
  • Manufacturer and OEM of RNE vertical spindle pumps and all steel motors for mines, chemical, plant and slurry application
  • Manufacturing agents of pumps, valves, crusher parts, electric motors, piping, switchgear, instrumentation as well as any mining and industrial equipment and spares
  • Market leaders in industrial heat-transfer products
  • Material handling equipment supplier
  • Mining and industrial ventilation fans and metal fabrication
  • Mining business intelligence
  • Mining, smelter and mineral processing contractors, furnace and industrial services
  • Overhead crane manufacturer and lifting equipment supplier
  • Product movement and transfer
  • Professional digital Motorola Mototurbo radio systems, underground communication, leaky feeders
  • Pumps, pump repairs and pump rental
  • Slurry knife gate valves
  • Specialists in hydraulics, mobile equipment components repairs and spares supply
  • Supplier of crusher spare parts and equipment
  • Supplier of trucks, forklifts, plant hire and tyres
  • Valves suppliers, manufacturers, reconditioning, and rubber liners

Last Updated 23/07

Zimplats is 87% owned by Implats. Its Ngezi operation is located on the Hartley Geological Complex on the Zimbabwean Great Dyke approximately 150km south-west of Harare. The Hartley Geological complex is the largest of the PGM bearing complexes, containing 80% of the known PGM resources in Zimbabwe, two-thirds of which is held by Zimplats. Zimplats operates four shallow mechanised underground mines, one open-pit and two concentrators at Ngezi. The Selous Metallurgical Complex (SMC), located some 77km north of the underground operations and comprises of a concentrator and a smelter. In FY 2022, Zimplats obtained a 185MW power generation license and by the end of the quarter, a cumulative USD1.1-million had been spent on the first phase of a solar project – a 35MW solar plant at the Selous Metallurgical Complex – and USD35.4-million had been committed, against a budget of USD37-million. The first of the project’s four implementation phases is progressing as planned, with the final phase scheduled for completion in FY2027, at a total project cost estimate of USD201-million.

Visitors:

Name of operation Type of OperationOwner of Operation Commodity
ZimplatsOpencast and undergroundImpala PlatinumPlatinum
Smaller mining operationsOpencast and undergroundVariousVarious

Exhibitors we would like to see:

Exhibitors we would like to see include those servicing the Platinum and PGMs industry.

Contact us if you need more information


 
Go to Top